Energy Commission of Nigeria
Plot 701C, Central Business Area, P.M.B. 358, Garki,
Pre-Qualification for ECN 2012 Fiscal Year Capital Projects
1. Introduction
The Energy Commission of Nigeria (ECN) invites interested and credible Companies to apply for pre-qualification for the various Projects of the Commission for the 2012 Fiscal Year.
Scope
The scope of work includes:
LOT 1: Completion of Energy Resources and Information Centre.
LOT 2: Rehabilitation/Repairs-Electricity.
LOT 3: Land-Fill Gas & Biogas Projects for Heating and Electrification.
LOT 4: Upgrading and Overhauling of ECN Facilities and Equipments.
LOT 5: Sustainable Energy Development.
1. Manpower Development
2. Energy Modeling
3. Awareness Creation
LOT 6: National Energy Master-Plan.
1. Development
2. Popularization and
3. Legal Instruments
LOT 7: Solar Powered Street Lights in various locations in the country.
LOT 8: Solar Powered Borehole in various locations in the country.
LOT 9: Solar PV as Alternative Electricity Source Pilot Projects (Mini-Grid and Solar Home Systems (SHS).
LOT 10: Promotion of Wind Energy, Establishment of Five Wind Electricity Pilot Projects in each Geo-political Zones.
LOT11: Laying down Guidelines for Utilization of Energy Resources for specific purposes.
LOT 12: Establishment of Platform for would-be Investors in Energy (One-Stop-Shop).
LOT 13: Small Hydro Power (SHP) Pilot Projects in Six Geo-political Zones).
LOT 14: Maintenance of Solar PV Power Street Lights and Boreholes across the Federation.
LOT 15: Pilot Biomass Power Plant in each geo-political zones.
LOT 16: Promotion of Energy Efficiency Conservation (pilot projects and awareness).
LOT 17: Production of off-shore Wind Information System for Nigeria.
LOT 18: Development of Pilot Energy Farm for Biodiesel Production.
LOT 19: National Energy Data Bank Development, (Hardware and Specialized Software etc).
LOT 20: ECN / NYSC Renewable Energy Programme.
LOT 21: Awareness Creation for Energy R&D Output for Commercialization.
LOT 22: Monitoring and Evaluation.
LOT 23: Monitoring the Implementation of Government Policies on Energy.
1. Conduct of Surveys and Seminars
2. Production of Reports (periodically)
LOT 24: Study on Biofuel Potential in Kano State.
3. Pre-Qualification Criteria
The following requirement for pre-qualification must be submitted:
a) Evidence of Company Incorporation in Nigeria
b) Evidence of Valid Tax Clearance and VAT Certificate
c) Evidence of pension compliance from National Pension Commission
d) Company Profile with list of Technical/Managerial Staff with evidence of previous work experience, detailed clients, nature of work/contract, contract sum etc.
e) Articulated Work Plan and Methodology
f) Evidence of Financial Capability
g) Experience in handling similar job is an added advantage.
4. Submission
Pre-qualification documents must be in sealed envelope marked “CONFIDENTIAL PRE-QUALIFICATION FOR ECN 2012 FISCAL YEAR CAPITAL PROJECTS” and the LOT of interest clearly printed at the top left corner of the envelope and submitted ON OR BEFORE 7th May,, 2012 to:
The Director General/CEO
Energy Commission of Nigeria Plot 701C, Central Business Area
P.M.B. 358,Garki, Abuja.
Note
Submission of the Pre-qualification documents is not a guarantee for the award of contract and MUST be arranged in accordance to their sequential order as stated in
(a-g) above.
Pre-qualification documents shall be closed by 9.00 am and opened by 10.00am prompt on the 7th May, 2012.
Only pre-qualified Companies will be invited to tender for the above listed projects.
Director-General/CEO
Energy Commission of Nigeria, Abuja.