Invitation for the Pre-Qualification for the Rehabilitation of Ninth Mile Corner Crash Programme Water Supply Scheme at Ministry of Water Resources, Enugu State

Enugu State Government

Ministry of Water Resources

Invitation for the Pre-Qualification for the Rehabilitation of Ninth Mile Corner Crash Programme Water Supply Scheme

 

The Enugu State Government intends to undertake the rehabilitation of Ninth Mile Corner Crash Programme Water Supply Scheme to boost water supply to some parts of Enugu Metropolis.

 

The works shall consist of:-

 

Lot 1:

A.     Rehabilitation of eight (8) existing boreholes and construction of four (4) new boreholes with all the mechanical/electrical installations.

 

B.     Completion of 300mm DI pipeline to channel the output (water) from borehole field into Agbaja Ngwo water reservoir for onward transmission to Enugu.

 

Lot 2:    Civil Works:

  • Construction of new staff residential quarters
  • Erosion works/replacement of collapsed internal block wall fence/pump house.
  • Construction of police outpost and quarters.
  • Rehabilitation of existing buildings.
  • Block wall perimeter fencing (340, 244m2 land area) of the borehole field.
  • Gen set house/switch room booster pump house, WTP buildings, etc.

Note prequalified contractors will be required to visit the site before commercial bidding.

 

The Enugu State Ministry of Water Resources therefore invites contractors for prequalification for the works outlined above. Invitation for the financial bidding will be made after the prequalification exercise.

 

Pre-Qualification Requirements:

  • Evidence of incorporation of Business name with corporate Affairs commission (CAC)
  • Evidence of registration as contractor with the Enugu State Ministry of Water Resources
  • Evidence of registration as contractor with Enugu State Ministry of Works & Infrastructure
  • Last Three (3) consecutive years tax clearance certificate
  • Provision of annual audited account of the company for the last three (3) years
  • Evidence of annual turnover in construction works of at least (five hundred million Naira (N500,000,000.00) value in any of the last five years.
  • Possession of experience as a prime contractor on projects of similar nature and complexity within the last five (5) years.
  • Must have project (or contract) manager who must be a COREN registered Engineer with at least 10 years experience in works of equivalent nature and volume including not less than 3 years as manager among its core staff.
  • Have liquidity and /or evidence of access to availability of confirmed positive credit facilities of not less than N200,000.000.00 (two hundred million naira) only.
  • Possess a substantial proportion of the construction equipment required to successfully execute the contract.
  • Submission of bank draft for fifty thousand naira (N50, 000.00) only made payable to the Enugu State Ministry of Water Resources being a non- refundable processing fee.

 

Application for pre-qualification should be submitted in sealed envelopes marked “Application to Pre-Qualify for the Rehabilitation of Ninth Mile Corner, Crash Programme Water Supply Scheme”. Indicating the lot of interest. This document must be signed and addressed to the Permanent Secretary, Enugu State Ministry of Water Resources, 1st & 2nd floor, DAD Building, Independence Layout, Enugu, to reach him on or before 21st May 2012.

 

Signed

Charles C. Eze

Permanent Secretary

 

Subscribe / Share

tendersnigeria tagged this post with: , , Read 4546 articles by

Leave a Reply

Your email address will not be published. Required fields are marked *

Search for Tenders

Subscribe to Email Alerts