PRE-QUALIFICATION FOR GEOTECHNICAL SERVICES SUBCONTRACT AT BECHTEL LNG CONTRACTORS LTD

Bechtel LNG Contractors Limited

Invitation for Pre-qualification – (ITT No. 25412-175-HC4-CY05-00001) For Geotechnical Investigation and Testing  Services Subcontract for the  proposed LNG Plant at  Brass Island, Bayelsa State, Nigeria

Introduction

Bechtel LNG Contractors Limited intends to award a Geotechnical investigation and  Testing  services Contract for specified area where Gas Trains 1 and 2 will be located at  LNG Plant  Project at Brass Island, in Beyelsa state, Nigeria. The purpose of the  work is to obtain high quality supplemental geotechnical information for the final design for Deep Mixing Method (DMM) for the first two LNG trains planned for the  facility. The scope of  Work is described further in the section below.

 

Bechtel LNG Contractors Limited therefore invited only interested, suitable , reputable, qualified and  experienced  Geotechnical Investigation and  Testing Services company or Consortiums having  proven experience, equipment and  resources in executing  services of this  nature and  size within Nigeria with adequate resources in terms  of manpower equipment and finance to submit proposals for the  pre-qualification of  Contractors to tender for the following brief and  indicative Scope of Work.

 

Scope of Work

The existing site condition where the  works will be performed is characterized by a generally level, swampy ground surface condition overgrown with moderately dense vegetation with occasionally shallow creeks. The  site is usually flooded during  the rainy season.

 

The scope of work is not  exhaustive and is  not  limited to the following:

1.         Survey works

2.         Access roads where needed

3.         Cone penetration Test (45 Nos) to depth of depths of approximately 60 metres including  pore water dissipation tests.

4.         Rotary Wash Soil Borings and sampling  (35 Nos) to variable  depths up to 120 meters  Sand sampling  with SPT, Modified California Sampler (or  equivalent); undisturbed clay sampling  with piston sampler, Shelby lubes, and  pitcher barrels as directed by Bechtel.

5.         Suspension geophysical logging

6.         Basic Laboratory Testing

7.         Advanced Testing overseas in Houston, TX, USA, to include UU, CIU and  Traiaxial, CU Direct Shear, and CRS consolidation tests

8.         Provision of geotechnical data report

This  includes the provision of equipment, personnel, labor, consumables, and  permits for the  works, as well  as securing  access to the sites. Works also includes shipping undisturbed samples overseas and contracting with an overseas lab (or use of affiliate).

 

The work shall be under the direct management of  Bechtel LNG Contractors Limited in accordance with the  specifications, procedures and guidelines issued in the signed  contract.

 

The  duration of the  Contract from the effective date to Final Acceptance shall not be  longer  than 7 months.

 

Licensing, Permits and HSE

Contractor shall have the necessary permits, licences, and accreditations to perform the Work Contractor shall  provide appropriately qualified personnel and related security arrangements  to perform  the work and have  appropriate Nigerian licenses and  qualifications.

 

The Contractor shall be responsible  for  applying, obtaining, maintaining all required licensing, authorizations, registrations and permits that may be required under the prevailing laws of Nigeria for the performance of these services. Contractor shall comply with all applicable health, safety and environmental laws and will be solely responsible for initiating, maintain and supervising  all HSE precautions  and  programs in line with the  projects HSE Policy, Project construction, Environmental Control Plan, and  EIA.

 

Compliance and Ethics

Bechtel LNG contractors Limited is interested in contracting with Company or consortium that strictly adheres to ethical business conduct and  compliance with all applicable laws. As Bechtel LNG contractors Limited is a subsidiary of a company or Consortium will be required to comply with the  requirements of the  United States Federal corrupt Practices Act, in addition to Nigerian corrupt Practices and other  Related offenses Act and other  laws and  regulations governing  corruption and  business ethics matters.

 

Financial Guarantee

The Contractor or consortium will be expected to provide guarantee for the  performance of its  work either by providing a parent company guarantee by its parent company or  shareholder(s) that is sufficiently capitalized or post a letter of credit in an  amount specified by Bachtel LNG Contractors  Limited, such amount not to exceed the  contract price.

 

Pre-qualification Requirements

To pre-qualify, it is mandatory that interested Contractors, Consortiums and Subsidiaries must provide the following required information and supporting documents for itself its affiliates, partners holding company, etc and incase of a Consortium for each of the members in the same manner and sequence as listed below. Failure to provide any of the requested information will disqualify the applicant.

 

1.         Company Profile

Ownership, Form, Contractor/consortium /with Parent company as  subsidiary/partners, affiliates,  giving name and details. Organization structure, charts with list of key management and technical personnel, giving names, position, qualifications, experience, age, role, nationality with CVs for Contractor and each participating member, parent holding, partners, affiliates, etc. If not a sole Contractor then provide structure, charts, list of key management & technical personnel, giving names, positions, experience, qualifications, age responsibility with CVs required for the management of the  consortium/JV/partnership, etc. Contract name, position and  contract details. Signed Agreement/MOU between the members specifying management structure and  work responsibility. Any literature, brochures, etc.

 

2.         Certificate and Registrations

Current copies of Certificate of Incorporation Registration in Nigeria Department of petroleum Resources (DPR). Permit Pay As You Earn (PAYE) Value Added Tax (VAT), Withholding Tax Documentation (WHT), Business Permit and income Tax Clearance (ITC) certificate for last three (3) years including  Tax Identification Number.ISO Certification, Memorandum of Articles and Association.

 

3.         Accounts and Insurance Records

Audited financial statements including  profit and loss accounts and  balance sheets for last three (3) years. Financial ratios to assess liquidity, profitability, e.g Current , asset turnover, debt/equity, turnover, etc. Fixed assets certified list & values, Bankers in Nigeria and  Overseas, Bank reference letters giving limits, and Insurance Policies list giving type, coverage, value, term and premium.

 

4.         Resources

List with evidence of Contractor’s owned resources covering Manpower (permanent contract staff) list giving name, position, qualifications, age, experience, scope work and nationality. Equipment  list giving type, make specifications year, function, location with ownership proof. Infrastructure offices, logistics, warehousing, list with evidence giving location, size in sq meter, facilities and  capabilities. Major sub-vendors-list with names address, contact person field of activities, executed contracts with value and duration.

Laboratory: Provide a detailed list of Contractors laboratory facilities, infrastructure, equipment, and resources for the performance of all the required tests to be done in Nigeria and overseas in accordance with the approved standards and specifications. State all overseas affiliates especially in Houston Texas where all advanced test are to be done.

 

5.         Past Work Experience

List with evidence of subcontractor’s and Consortium’s past Geotechnical Services, contracts work experience during  the last ten (10) years in Nigeria and Overseas giving brief scope of work, client name, work site, contract award value, contract duration, final contract value, actual completion date and duration, Project Manager’s name, and contact details for:

All Geotechnical Services projects completed (attach completion certificate).

 

6.         Current Workload

List with evidence of subcontractor/Consortium ongoing  and future  projects (2011-2013) in Nigeria and overseas giving brief scope of work, client name, work site, contract award value, contract duration, percentage completion supported by ,milestone completion certificates, Project Manager’s name and contact details.

Graphical presentation showing availability of equipment, finance and manpower, for executing this work between 2011- 2012.

 

7.         Procurement

Procurement Policy and procedures, Plan & Organization structure used in a  major  Geotechnical Contract.

 

8.         Health, Safety and Environment

Standard written Policy and Program, Track record statistics- fatalities, lost workdays, etc and  experiences for the last (3) years.

 

9.         QA/QC

Policies, standards & Program used for subcontractors, materials & Services in a major Geotechnical Services Contract.

 

10.       Planning, Cost and  Doc. Control

Standard Policies, Procedures, for project, cost and documentation control used in major Geotechnical Services Contract.

 

11.       Community Relations

Policy and organization structure used in largest Geotechnical Services Contract for handling community related issues. Past experience with communities  in the Niger Delta  Region. List of community development projects completed and in progress including  brief scope of work, client, location, value and duration.

 

12.       Nigerian Content

Consistent  with the Nigerian Oil and Gas Industry Content Act, 2010. Bechtel LNG Contractors Limited is committed to provide maximum opportunities for Nigerian capacity utilization and  development of  in-country expertise.

Therefore, Bechtel LNG Contractors Limited  expects Contractors and consortiums to fully comply with the  Nigerian Government directives on Nigerian Content including in-country domiciliation of all personnel, supporting activities as well as locating both the project Management Team and procurement centres in-country and carrying out in-country scope of work. Contractors shall provide a plan and strategy showing commitment to meeting the Nigerian content targets and  how the  Contractor intends to perform the work consistent with the  Nigerian Content Act.

 

Major companies  and  Consortiums that possess adequate experience  and resources and include Nigeria companies in their execution strategy and are committed to comply with Nigerian Content  requirements  for this scope of work will have an advantage.

 

Demonstrate that the entity is a Nigerian Registered Company, or  Nigerian Registered Company as the  contracting  entity in genuine alliance or joint  venture with foreign company with details on scope  and responsibilities of parties for this work. Such companies  must show evidence of joint venture binding agreement duly signed by the  CEO of both companies including evidence or plans of physical operational presence and set up in Nigeria.

 

Furnish details of company ownership and share holding structure. Also submit clear photocopies of your CAC Forms CO2 and CO7.

Subcontractors and Consortiums that are structured simply as agencies or representatives will be excluded.

 

Responses must include the  following:

  • List of works sub-contracted to Nigerian Subcontractors  and  suppliers, in the  last three (3) years for Geotechnical Services contracts given name, LGA, work site location, client’s name, contract description, contract value, brief scope of  work, duration and  percentage  of total contract value
  • Nigerian manpower hired  giving  number, percentage  and value during  the  contract period  in the most recent  major  Geotechnical services contract.
  • Provide  detailed  plan for staff training  and  development  on engineering, project management  and procurement  (including all software to be  used, number  of personnel, name of organization providing  such training  and  evidence  of past training record) for  Nigerian personnel including  description of any specific programs in place for transfer  of technology and skills to indigenous  business and  Nigerians for the  duration of the  contract.
  • Provide  a MOA with OGTAN Registered training  facility for both theoretical and attachment for the  duration of the  project.
  • Provide evidence of domiciliation of project  management  and procurement  centres  in Nigerian with physical address (not P.O.Box).
  • Location of in-country facilities  (equipment, storage, workshops, repair and  maintenance facilities and  testing  facilities.
  • Contractors  must be  willing  and  able  to provide evidence  of maximization of made  in Nigeria goods and  services.
  • Plan and strategy utilized  in maximizing  Nigerian content in most recent  major  Geotechnical Services Contract – Proposal for achieving  Nigerian Content in this  contract.

 

 

13.       Any additional information

That will pre-qualifications. In case of consortiums, the above requirements are to be furnished for each and every member demonstrating joint and several liabilities to perform. Failure to provide and of the requested information and documents will disqualify the applicant. Please note that Subcontractors/ Consortiums will be evaluated for the completeness and quality of the information presented with supporting documents, demonstrating their technical, financial and managerial capabilities in executing the entire and not part of the scope of work, pre-qualification proposals should be submitted in three (3) sets of hardcopy plus two (2) sets of CD-Rom Each set must be properly indexed, separated and arranged into the 13 sections, in the serial order as indicated above and submitted in a sealed envelope printed to show the following:

 

CONFIDENTIAL – BECHTEL LNG CONTRACTORS LTD PRE-QUALIFICATION FOR GEOTECHNICAL SERVICES SUBCONTRACT

Name of contractor or Consortium Pre-qualification documents must be submitted on or before 3:00 p.m., on 27th April 2011 at the following address:

Mr. James Michael Presley

Project Contracts and Procurement Manager

Bechtel LNG contractors Limited

Plot 1680 Sanusi Fafunwa

Victoria Island Lagos, Nigeria

 

Late submissions of the proposals will not be considered under any circumstances.

 

Please Note:

This advertisement is not an “invitation to tender” but only an “invitation for pre-qualification” and must not be construed as a commitment on part of Bechtel LNG Contractors Limited nor shall it entitle potential tenderers to make any claims whatsoever and/or seek any indemnity from Bechtel LNG Contractors Limited and/or any of its shareholders by virtue of such potential tenderers having responded to his advertisement.

Notwithstanding submission of the pre-qualification information, Bechtel LNG Contractors Limited is neither committed nor obliged to include your Company on any bid list or bear any expenses qualification documents or to award any form of  contract to your Company and/or associated Companies, Consortium, Subcontractors or Agents. Only short-listed Subcontractors and Consortiums having similar past experience, adequate equipment and financial, manpower, technical capabilities and resources will be invited to participate in further activities leading to tender stage.

 

Full tendering procedure will be provided only to the pre-qualified companies. In addition to the review of the proposals, team visits to facilities, and safety, technical and financial audits maybe conducted

 

Bechtel LNG Contractors Limited will only deal with authorized officers (with Power of Attorney) of the Pre-qualifying and tendering companies and NOT through individual or agents.

 

Bechtel LNG Contractors Limited will not enter into correspondence with any Contractor company or individual on why it was short-listed or not short-listed.

 

 

 

 

 

 

 

 

 

 

Subscribe / Share

tendersnigeria tagged this post with: , Read 4546 articles by

Leave a Reply

Your email address will not be published. Required fields are marked *

Search for Tenders

Subscribe to Email Alerts