Solicitation for Pre-Qualification of Contractors at Niger Delta Development Commission (NDDC)

Niger Delta Development Commission (NDDC)

167. Aba Road, Port Harcourt. Rivers State   

www.nddc.gov.ng

 

Solicitation for Pre-Qualification of Contractors

 

Introduction

The Niger Delta Development Commission (NDDC) in furtherance of its mandate is planning to undertake some developmental projects for the even, rapid and sustainable development of the Niger Delta Region and is seeking to hire specialist contractor for the execution of the under-listed projects.   The NDDC, therefore request for the solicitation for prequalification from top flight, knowledgeable, competent and experienced contractors whose areas of competence and core business fall within the project classification.

 

The projects are:

 

S/N Project Description 

 

State
1 Construction of Esit Eket internal roads phase

 

Akwa Ibom
2 Construction of link Road (22km) from Coast to Apoi Creek in Southern Ijaw Bayelsa
3 Foreshore wall / Reclamation at Abari in Delta State Delta
4 Sand filling and Land Reclamation of Torugbene Burutu Delta
5 Construction of Udo Ofunma Ajakuroma Road with link Bridge across Ofunma Phase 2 to connect Ofunma and Ogbodu/Ogbiribri communities of Delta State (22km) Delta
6 Umuekemai-Agbeja Umullabia Eke Umuada-Orgi Road with Loop from Umuezeaia-Umukahia Ngboroko Road, Mbano

 

Imo

 

7 Sandfilling and shore protection/ land reclamation works at Ogan Ama, Dumo in Okirika LGA Rivers
8 Dualization of Edepie Junction to Kolo/Oloibiri Phase 1 Bayelsa

 

 

Solicitation for Pre-Qualification

Every interested and suitably qualified contractor with real operating and relevant experience is invited to submit its solicitation for prequalification document to be used for pre-qualification exercise.

 

 

A. Corporate

  • Evidence of registration with CAC
  • Clear indication of a verifiable head office address
  • Corporate profile of the company indicating ownership structure
  • A confirmable evidence of up-to-date Annual Returns,
  • A confirmable VAT certificate with evidence of remittance.
  • A confirmable evidence of Tax Clearance Certificate for the past 3 years duly certified by FIRS
  • Proof of contribution to ITF
  • Sworn affidavit that the company is not bankcrupt
  • Sworn Affidavit that the consultant/key personnel are not ex-convicts or bankrupt
  • Evidence of financial capability and banking support including banks reference and recent statement of account
  • A statement of interest including a statement of ability to undertake the job (within agreed time frame)
  • An undertaking/ Assurance for the delivery of the project in line with project brief
  • All submissions must be in both soft and hard copies

 

B. Technical

  1. Area(s) of specialty
  2. Technical capability of the company/including CV/photocopies of certificates of relevant staff

5.       Evidence of trade records in the execution of similar projects

6.       Evidence of payment for similar job done m the past with verifiable names and telephone numbers of contact persons from the awarding institutions

7.       CASHES and quality Assurance policy of the company

8.       Any other relevant information that will facilitate the evaluation of the company.

 

 

Evaluation Criteria

Consultants are expected to comply with the above requirements as failure may lead to the cancellation of the contractor’s submission.   Contractors are to submit only genuine and verifiable documents as Contractors who submits fake or fraudulently obtained documents will be disqualified and the attention of relevant security agencies may be drawn. All Solicitation for prequalification will be based on the contractor’s technical and corporate capabilities.

 

 

Other Relevant Information

  • The selection of contractors for this project will follow the provision and procedures outlined in the Public Procurement Act 2O07.
  •  Only Contractors who have been successfully pre-qualified will proceed to the next stage of the procurement process and would be duly notified through a publication on the NDDC official website
  • Contractors can seek clarifications or request for additional information by writing to toe office listed below before the deadline of the submission, from 11 am to 4pm Mondays through Fridays (except public holidays)
  • Contractors are advised not to try to influence the selection process as this will lead to their immediate disqualification.  Such Contractors may also be barred from seeking other job opportunities from the Commission in future
  • All cost incurred by any Contractor in the preparation and submission of the document are to be borne entirely by the Contractor.
  • The Commission reserves the right to reject any/all of the documents and to terminate the entire selection process at any time without any liability to the Commission

 

Validity of the Expression of Interest

Solicitation for Pre-qualification written in English language must be submitted in an addressed envelope marked at the top left corner “SOLICITATION FOR PRE-QUALIFICATION” to the address stated below on or before Wednesday, April 9th 2013

 

The Managing Director/CEO

Niger Delta Development Commission

167, Aba Road, Port Harcourt

Rivers State

 

Signed

Management

 

Subscribe / Share

tendersnigeria tagged this post with: , , Read 4546 articles by

Leave a Reply

Your email address will not be published. Required fields are marked *

Search for Tenders

Subscribe to Email Alerts