Federal Ministry of Environment
Headquarters, Mabushi, Abuja
Request For Expression of Interest: Consultancy Services
FMENVT/2012/EOI-I
- Introduction:
The Federal Ministry of Environment intends to finance the following assignments described below under the 2012 Capital Budget.
- Scope: The scopes of the assignments vary for the various lots and are as follows:
S/N | Lot Number | Project Description |
1 | EOI-I-FR-1 | Consultancy for the Preparation of Natural Resources Conservation, Development of Management Plans for Omo Forest Reserve and Co management of AMBOI/Baissa Forest Reserve. |
2.
|
EOI-I-FR-2 | Consultancy for the Improvement of Forest Resources Development and Management: Review of Forestry Revenue System, National Forestry Development Dialogue, Monitoring and Evaluation Frame Work and System. |
3 | EOI-l-FR-3 | Consultancy for Training Workshop for the Promotion of the Utilization of NYPA PALM in Akampa, Akpabuyo, Cross River State. |
4 | EOI-l-FR-4 | Event Management Services for 2012 National Tree Planting Campaign. |
5 | EO1-1-DD-1 | Consultancy for the Preparation of the Strategic Action Plan for the Great Green Wall (Nigeria) Programme |
6 | EOI-l-PC-1 | Project Appraisal, Detailed Engineering Design and Bills of Engineering , and Evaluation for the Construction of Integrated waste management Facility in oyo |
7 | E01-I-PC-2
|
Project Appraisal, Detailed Engineering Design and Bills of Engineering Measurements and Evaluation for the Construction of Ilorin Integrated Waste Disposal and Management Facility. |
8 | EOI-I-PC-3
|
Air Quality Monitoring and Management Consultancy in Idu Industrial Layout, Abuja |
9 | E01-I-PC-4
|
Project Appraisal, Detailed Engineering Design and Bills of Engineering Measurements and Evaluation for the Construction of Scrap Metal Recovery and Management Facility. |
10 | EOI-I-PC-5
|
Project Supervision Consultancy for the Construction of Scrap Metal Recovery and Management Facility. |
11 | EO1-I-PC-6
|
Project Appraisal, Detailed Engineering Design and Bills of Engineering Measurements and Evaluation for the Construction of Waste Recycling Facility in Owerri Imo State. |
12 | EOI-l-EA-1
|
Environmental Survey of Nigeria Rivers, Phase 1: – River Niger |
13 | EOI-I-EA-2
|
Environmental Survey of Nigeria Rivers, Phase 1:- River Benue |
14 | EOI-l-EA-3
|
Development and Production of Sectoral Guidelines for Environmental Impact Assessment: Telecommunication Sector |
15 | EOI-l-EA-4
|
Development and Production of Sectoral Guidelines for Environmental Impact Assessment: Power Projects |
16 | EOI-I-EA-5
|
Development and Production of Sectoral Guidelines for Environmental Impact Assessment: Bitumen Exploration and Exploitation |
17 | EO1-I-EA-6
|
Development and Production of Sectoral Guidelines for Environmental Impact Assessment: Mining |
18 | EOI-I-EA-7
|
Development and Production of Sectoral Guidelines for Environmental Impact Assessment: Post Impact Assessment |
19 | EOI-I-EA-8
|
Review of Existing Sectoral Guidelines for Environmental Impact Assessment: Oil & Gas Sector |
20 | EOl-l-EA-y
|
Review of Existing Sectoral Guidelines for Environmental Impact Assessment : Eco Labeling & Water Quality |
21 | EOI-l-EA-10
|
Review of Existing Sectoral Guidelines for Environmental Impact Assessment : EIA Procedural Guidelines and the EIA Act of 1992 |
22 | EOI-l-EA-1 1
|
Consultancy for Survey of Soil Quality in Four LGAs in Kogi State |
23 | EOI-I-EA-12
|
Consultancy for the Conversion of EIA Reports to digital formats for the EIA Registry. |
24 | EOI-l-LA-1
|
Consultancy for the establishment of E-library for the Legal Unit |
25 | EOI-I-CC-1
|
Consultancy for Developing a National Greenhouse Inventory System |
26 | EOI-I-CC-2
|
Consultancy tor Developing a National Action Plan For Implementing Clean Development Mechanism (CDM) Projects in Nigeria |
27 | EOI-l-CC-3
|
Consultancy for Developing a Pilot Adaptati on Project for Fishing Farmers on a Small Scale to adapt to the Impact of climate Change |
28 | EOM-CC-4
|
Consultancy for Impact, Adaptation and Vulnerability to Impacts of Climate Change in North Eastern Nigeria |
29 | EOI-I-CC-5
|
Consultancy for the Development our Industrial Environment specifically for the Value Chains for Renewable Energy |
30 | EOI-l-EC-1
|
Project Appraisal, Detailed Engineering Design and Bills of Engineering Measurements and Evaluation for Erosion and Mood Control Works |
Tender Requirements:
Interested companies are required to posses and submit the following as part of the Expression of Interest documents. Firms without any of I-XII need not apply.
(i) Certificate of Registration with Corporate Affairs Commission (Limited
liability only)
(ii) Evidence of VAT Registration and Remittance
(iii) Company’s current Tax Clearance certificate for the last three (3)
years. (State Tax Identification Number TIN)
(iv) Evidence of Compliance (Registration and Remittance) with the provision of the Industrial Training Fund (ITF) Amendment Act 2011
(v) Evidence of Compliance (Registration and Remittance) with the provision of the PENCOM Act 2004.
(vi) Provide details of Company’s profile including the Curriculum Vitae of 5 most important professional staff and other resources
(vii) Verifiable evidence of previous experience in the jobs of this
magnitude/nature. (Attach letters of Award and Certificates of Completion)
(viii) List of Equipment Owned with identification numbers,
(ix) Company Audited Account for the last 3 Years.
(x) Evidence from the company’s Bankers as to its financial capacity/Bank
Support to undertake the assignment, if awarded.
(xi) Name/e-mail Address and phone number of contact person.
(xii) A Letter authorizing the Federal Ministry of Environment to verify claims with relevant agencies or bodies.
Please provide ONLY coloured photocopy of the documents listed as items i, ii and iii
Additional Information:
(i) Notwithstanding the submission of tender data the Federal Ministry of Environment is neither committed nor obligated to include your company or any bid list or award any form of contract to your company or agent.
(ii) The advertisement shall not be considered as commitment on the part of the Federal Ministry of Environment; nor shall it entitle potential companies to make any claims whatsoever or seek any indemnity from the Federal Ministry of Environment by virtue of such company having responded to the advertisement.
(iii) The Federal Ministry of Environment reserves the right to make available the Tender documents to shortlisted firms only.
Submission and Deadline:
The Submission is to consist of one original and two duplicate copies in the envelope marked “CONFIDENTIAL” on the Top left corner and written EOI (Specify LOT) at the centre. The submission is to be addressed to:
The Secretary,
Ministerial Tenders Board
Federal Ministry of Environment,
Abuja.
Telephone: 08094912628
E-mail: mtbfmenvt_abuja@yahoo.com
and Submitted at:
Room 019, Ground Floor, Green Building,
Federal Ministry of Environment
Plot 14 Aguiyi Ironsi Street,
Maitama, Abuja.
Deadline for submission is 11.00 a.m. on 16th July, 2012 (late EOls will be rejected) while the EOIs will be opened by 12.00 noon same day at:
Auditorium, Ground Floor, Green Building
Federal Ministry of Environment
Plot 14 Aguiyi Ironsi Street,
Maitama, Abuja.
NOTE: Only shortlisted firms will be notified. Complete set of Request for Proposal documents shall be issued to shortlisted firms at a later date from Secretariat of MTB Federal Ministry of Environment, Room B301, Mabushi upon the payment of a non-refundable fee of N10.000.00 in bank draft issued in favour of Federal Ministry of Environment for each of the Lot. (Bids switching after purchase will not be allowed
Signed:
Permanent Secretary