Nigerian Content Development and Monitoring Board (NCDMB)
Expression of Interest
1. Project Management
2. Information Technology Infrastructure
1.0 Introduction
The Nigerian Oil and Gas Industry Content Development Act was signed into law on April 22, 2010 by the President of the Federal Republic of Nigeria. The law established the Nigerian Content Development and Monitoring Board (NCDMB) to implement the provisions of the Act. The Bayelsa state government has offered the Board a parcel of land in Central Business District of Yenagoa upon which to build its headquarters. It is the intention of NCDMB to build a state of the art, multi-storey building on this parcel of land.
NCDMB hereby invites Expression of Interest from qualified Project Management firms (to coordinate all activities necessary for this building complex) and IT infrastructural firms.
2.0 Terms of Reference (TOR)
2.1 Scope of Work and Services – Project Management
The Project Management firm will perform the following tasks:
i.) Preparation of the overall scope of works for the Land Surveyors, Geo-Technical Surveyors, Quantity Surveyors, Architects, Civil/Structural engineers, Electrical engineers, Mechanical and plumbing engineers and HVAC system engineers.
ii) Evaluation of technical and commercial proposals
iii) Planning, including schedule of the works to commissioning
iv) Coordination of the activities of the Land Surveyors, Geo-Technical Surveyors, Quantity Surveyors, Architectural firms and the Engineering design teams.
v) Reporting to the representative of the Board on a daily basis
vi) Giving regular reports on activities of the project to the Board
vii) Representing the Board on all matters relating to the building project
23, Scope of Work and Services – Information Technology Infrastructure
The IT Infrastructural firm will provide the following services:
Prepare the necessary work scope to enable the contractor provide IT infrastructure including; Information Transport Systems, Voice .Network (VoIP) CCTV, Intranet and Extranet Communications, document management system, audio visual services, video conferencing, etc for the building.
3.0 Requirements
Interested firms are to submit the following:
1. Detailed Company profile in English language.
2. Evidence of registration with professional bodies.
3. Firm’s organizational structure including resume of key personnel showing qualified and certified personnel to carry out these works
4. Details of relevant, verifiable experience of similar works that firm or
group has undertaken in the last fifteen (15) years, inside or outside
Nigeria.
5. Audited-accounts/financial reports for the last three (3) years.
6. Tax clearance certificate for the past three (3) years.
7. Evidence of compliance with the Pensions Act.
8. Evidence of financial capability/reference letter from a reputable Nigerian bank,
9. Reference of three major customers that can be contacted for information/reference
10. HSE related certifications available: ISO
11. Quality Assurance System certified ISO
12. Copy of Current Certificate of Registration with Corporate Affairs Commission (CAC).
4.0 Nigerian Content Requirements
1. Compliance to the provisions of the Nigerian Oil & Gas industry Content Development Act 2010.
2. Consistent with The Nigerian Oil & Gas industry Content Development Act 2010,
NCDMB is committed to providing maximum opportunities for Nigerian capacity utilization and development of in-country expertise and compete