Federal Republic of Nigeria
Sokoto Rima River Basin Development Authority
Damale Kaita House, Gusau Road, P.M.B 2223. Sokoto
Sokoto State of Nigeria
1.0 Introduction
The Sokoto Rima River Basin Development Authority wishes to carry out procurement of construction of motorized boreholes, small irrigation schemes, small and medium earth dams, water supply schemes and consultancy on supervision of various projects with provisions in the 2012 Appropriation.
1.1 This Authority therefore wishes to invite as follows:
A) Consultancy:
Reputable consulting firms including Joint Venture (JV) to submit technical proposals for Consultancy Services of the following projects:
Lot A1: Construction Supervision of small irrigation schemes in Zamfara West Senatorial District, Zamfara State
Lot A 2: Construction Supervision of minor irrigation schemes in the 6 LGAs of Zamfara West Senatorial District which involves the construction of tubwells and wash bores
Lot A 3: Construction Supervision of minor irrigation scheme at 11 LGAs, Katsina South Senatorial District, Katsina State.
Lot A 4: Construction supervision of Sulma dam at Kafur LGA, Katsina State.
Lot A 5: Construction Supervision of Small Irrigation Scheme (Srrbda) in Gummi/Bukkuyum Federal Constituency, Zamfara State
Lot A 6: Construction Supervision of Tube Wells, & Supply of Irrigation Pumps, Motorcycle and Tricycles in Augie, Argungu, Dandi, Arewa, Suru and Bagudo LGAs, Kebbi State
Lot A 7: Construction Supervision of Boreholes in Katsina North Senatorial District, Katsina State
Lot A 8: Construction Supervision of 5km Road Project that runs between Barmo to Kahuta and Barmo to KokamiBakori/ Danja Federal Constituency, Katsina State
Lot A 9: Construction supervision of Boreholes in Katsina Central Senatorial District, Katsina State
Lot A10: Construction Supervision of Small Irrigation Scheme in Gummi/Bukkuyum Federal Constituency, Zamfara State
Lot A 11: Construction Supervision of Rehabilitation of Funtua Water Works, Katsina State
Lot A 12: Study and Design of Ngaski/Yauri Irrigation Scheme
B) Goods:
Lot B1: Procurement of Equipment for Bakolori Irrigation Project, (phase II) Zamfara State
Lot B 2: Provision of Fertilizers (Npk/Urea) in Aliero,Gwandu and Jega Local Government Areas of Kebbi State.
Lot B 3: Provision of Fertilizers to farmers in Birnin Kebbi, Kalgo and Bunza Local Government Areas of Kebbi State
C) Works:
Lot C1: Construction of Small Irrigation Schemes in Zamfara West Senatorial District, Zamfara State
Lot C 2: Construction of Minor Irrigation Scheme in the 6 LGAs of Zamfara West Senatorial District, Zamfara State
Lot C 3: Construction of Minor Irrigation Scheme at 11 LGA, Katsina South Senatorial District, Katsina State.
Lot C4: Construction of Dam at Sulma, Kafur LGA, Katsina State
Lot C 5: Construction of Boreholes in Zurmi, Shinkafi Federal Constituency, Zamfara State
Lot C6: Construction of Small Irrigation Scheme (Srrbda) in Gummi/Bukkuyum Federal Constituency, Zamfara State
Lot C7: Construction of Small Irrigation Scheme (Srrbda) in Maru/Bungudu Federal Constituency, Zamfara State
Lot C8: Construction of motorised boreholes in the following areas of Tambuwal LGA: Bagasakka, Kaya, Barga, Kokoro and Tulluwa,Sokoto State
Lot C9: Construction of motorised boreholes in the following areas of Tureta LGA: Tsamiya, Dumma, LambarTureta, Sokoto State
Lot C10: Construction of motorised boreholes in the following areas of Kyabe LGA: Runtawa, Zugu, Jikiri Sokoto State
Lot C11: Construction of motorised boreholes in the following areas of Shagari LGA: Horo Binji, Dandin Mahe, Mandera ,Sokoto State
Lot C12: Construction of motorised boreholes in the following areas of Dange Shuni LGA: Dawaida, Gajara, Darga, Sokoto State
Lot C13: Construction of motorised borehole in the following areas of Bodinga LGA: Tulluwa, KwachiyaLalle, Sifawa, Hurumi ,Sokoto State
Lot C14: Construction and Provision of Tube-Wells & Hand Pump in the following areas of Sokoto State: SabonBirni, Isa, Goronyo, Gada, Illela, Gwadabawa, Wumo, Rabah Sokoto State
Lot C15: Construction of Minor Irrigation Schemes at Birnin Kebbi, Makera, UjariyoAmbursa Kardi, Kebbi State
Lot C16: Construction of Minor Irrigation Scheme at Maiyama, SabonBirni, Sambawa Mayalo, Mungadi, Andarat, Kebbi State
Lot C17: Construction of Minor Irrigation Scheme at Koko Besse, Dutshinmari, ZarAkala-Kala, Jadadi, Lani, Kebbi State
Lot C18: Construction of Minor Irrigation Scheme at Jega, Alelu, Kimba, Jandutshi, BirninMallam, Dumbego,Kebbi State
Lot C19: Construction of Tube Wells, & Supply of Irrigation Pumps, Motorcycle and Tricycles in Augie, Arugungu, Dandi, Arewa, Suru and Bagudo LGAs of Kebbi State
Lot C20: Construction of Boreholes in Katsina North Senatorial District, Katsina State
Lot C21: Constructs of Boreholes in Mashi/Dutsi Federal Constituency, Katsina State
Lot C22: Construction of Boreholes in Manu/Bindawa Federal Constituency Katsina State
Lot C23: Construction of Boreholes in Kankia/Kusada/Ingawa Federal Constituency, Katsina State.
Lot C24: Construction of Boreholes in Baure /Zango Federal constituency, Katsina State
Lot C25 Construction of Boreholes in Daura/Sandamu/Maidua Federal Constituency, Katsina State.
Lot C26 Construction of Boreholes in Kafur/Malumfashi Federal Constituency, Katsina State
Lot C27 Construction of 5km Road Project that runs between Barmo to Kahuta and Barmo to Kokami Bakori/Danja Federal Constituency, Katsina State
Lot C28: Construction of Boreholes in Funtua/Dandume Federal constituency, Katsian State
Lot C29 Construction and equipping of Youth development, trade and skill acquisition centre in Kankara: faskari/Kankara/Sabuwa Federal Constituency, Katsina state
Lot C30: Construction of Boreholes in Musawa/Matazu Federal Constituency, Katsina State
Lot C31: Construction of Boreholes in Katsina Central Senatorial District, Katsina State
Lot C32: Construction of Minor Irrigation Project in Zuru LGA, Kebbi State
Lot C33: Construction of Minor Irrigation Project in Mahuta LGA, Kebbi State
Lot C34: Construction of Minor Irrigation Project in Yauri LGA, Kebbi State
Lot C35: Construction of Minor Irrigation Project in Wasagu LGA, Kebbi State
Lot C36: Construction of Minor Irrigation Project in Shanga LGA, Kebbi State
Lot C37: Construction of Minor Irrigation Project in Wara LGA Kebbi State
Lot C38: Construction of Minor Irrigation Project in Makuku LGA, Kebbi State
Lot C39: Construction of Community based Water Supply Project at Illela-Tozai, Illela LGA, Sokoto State
Lot C40: Construction of Community based Water Supply Project at Chimmola, Gwadabawa LGA Sokoto State
Lot C41: Construction of Hand Pump at Gigane village of Gwadabawa LGA, Sokoto State
Lot C42: Provision of Tube Wells in Birninin Kebbi, Kalgo and Bunza Local Government Areas, Kebbi State
Lot C43: Provision of Minor Irrigation Scheme in Kamba, Kamba Local Government Area, Kebbi State
Lot C44: Provision of Minor Irrigation Schemes in Doli and Kambuma, Kamba Local Government Area, Kebbi State
Lot C45: Provision of Minor Irrigation Schemes in Kamba and Mallamawa, Kamba Local Government Area, Kebbi State
Lot C46: Construction of Community based Water Supp;y Project at Baguma, Kamba LGA Kebbi State
Lot C47: Construction of Tube Well in suru and Bagudo LGAs, Kebbi State
Lot C48: Provision of Tube Wells in Aliero, Gwandu and Jega Local Government Areas, Kebbi State
Lot C49: Establishment of Pilot Fish Farm Projects in Aliero, Gwandu and Jega Local Government Areas, Kebbi State
Lot C50: Construction of Tube Wells in Koko and Maiyama towns in Koko-Besse and Maiyama LGAs, Kebbi State.
Lot C51 Construction of small Irrigation Scheme at Argungu town, Argungu LGA, Kebbi
Lot C52: Construction of small Irrigation Scheme Agie town, Augie LGA, Kebbi
Lot C53: Construction of community based Water Supply Projects at Sauwa, Zazzagawa and Kukadu villages of Argungu LGA, Kebbi State.
Lot C54: Construction of Community based Water Supply project at Garuand Kurbaban villages of Augie LGA, Kebbi State
Lot C55: Construction of Drainages at Lailaba town, Kebbi State
Lot C56: Construction of Drainages at Argungu LGA, Kebbi State
Lot C57: Construction of Drainages at Tungar Rafi and Tungar Maidawa in Argungu LGA, Kebbi State
Lot C58: Construction of Drainages at Zagi in Agie LGa, Kebbi State
Lot C 59: Construction of Small Irrigation Scheme in Gummi/Bukkuyum Federal Constituency, Zamfara State
Lot C 60: Construction of Small irrigation Scheme in Maru/Bungudu Federal Constituency Zamfara State
Lot C61: Construction of Boreholes in Zurmi?Shinkafi Federal Constituency, Zamfara State
Lot C62: Construction of Motorized Borehole at Tawalala, Daura LGA, Katsina State
Lot C63: Construction of Motorized Borehole at Dumurkwal, Maiadua LGA, Katsina State
Lot C64: Construction of Motorized Borehole at R/Tsamiya, Sandamu LGA, Katsina State
Lot C65 Construction of Hand pumps Boreholes in Kaita/Jibiya Federal Constituency, Katsina State
Lot C66; Construction of Hand Pumps in Dutsin-Ma/Kurfi Federal Constituency, Katsina State
Lot C67: Construction of Hand Pumps in Musawa/Matazu Federal Constituency, Katsina State
Lot C68: Construction of Hand Pumps in Batagarawa/Rimi/Charanchi Federal Constituency Katsina State
Lot C69: Construction of Hand Pumps Baure/Zango Federal Constituency, Katsina State
Lot C70: Construction of Hand Pumps in Katsina Central Federal Constituency, Katsina State
Lot C71: Construction of Hand Pumps in Mashi/Dutsi Federal constituency, Katsina State
Lot C72: Construction of Community based Water supply Scheme at Kofa Gidan Alaramma Doro, Katsina State.
Lot C73: Construction of Hand pump in Bindawa/Mani Federal constituency, Katsina State
Lot C74: Construction of Hand Pums in Kafur/Malumfashi Federal Constituency, Katsina State
Lot C75: Construction of Hand Pumps in Kankia/Kusada/Ingawa Federal Constituency, Katsina State
Lot C76: Construction of a Library at Funtua, Funtua Local Government, Katsina State
Lot C77: Construction of Community based Water Supply Scheme at Ahmadu Bello Way Area, Sokoto south LGA, Sokoto State
Lot C78: Provision of Hand pumps at Zango/Baure Fed. constituency, Katsina State
Lot C79: Construction of Community based Water supply Project
Lot C80: Provision of Hand pumps at Tsafeand Gusau LGAs, Zamfara State
Lot C81: Provision of hand Pumps at Anka/Mafara, Zamfara State
Lot C82: Provision of hand Pumps at Gidan Gyare, Karauka and Riyoji, Zamfara State
Lot C83: Provision of Hand pumps at Gyalange, Bardoki, Gamo, Gambanda Magiro, Gayari, B/Tudu, B/Magaji, B/Zauma, Zarammai, Gwashi, Kyaram, Falale, Yashi, Nasarawa, Masama, Adabka and Burkuyum, Zamfara State.
Lot C84: Construction of Solar Street Light at Shinkafi, Zamfara State
Lot C85: Provision of Hand Pumps at Maman Suka and Matse, Gwadabawa LGA, Sokoto State
Lot C86: Construction of Motorised Boreholes at Isa/Sabon-Birni Federal Constituency, Sokoto State
Lot C87: Construction of Motorised Boreholes at Wurno/Rabah Federal Constituency, Sokoto State
Lot C88: Construction of Motorised Boreholes at Yabo/Shagari Federal Constituency, Sokoto State
Lot C89: Construction of Hand Pump at Malunfashi, Katsina State
Lot C90: Construction of Hand Pump at Kafur, Katsina State
Lot C91: Construction of Hand Pump at Kwarago, Katsina State
Lot C92: Provision of Hand Pumps at ICT Centre Site and Police Station, Batagarawa town, Katsina State
Lot C93: Construction of Hand Pump at Mashi LGA, Katsina State
Lot C 94: Construction of Community based Water Supply Project at Bagaje, Baure LGA Katsina State
Lot C95: Construction of Hand Pumps at Makiyawa, TarkeKofar Maigari, Ishiyawa and Matsiga – Gindinlcce, Katsina State
Lot C96: Provision of Hand Pumpsat Dutsin-Ma A Wakaji, Kuki A Doro, MakeraKaro, Gabas da Kasuwa, Rawayau A Dangawo and Rawayau B Dorogo, Katsina State
Lot C97: Constriction of Motorised Community based Water Supply Scheme at Rawayau town, Katsina State
Lot C98: Provision of Hand Pumps at Bakori/Danja Federal Constituency, Katsina State
Lot C99: Construction of Hand Pump at Central Market Daura, Katsina State
LotC100: Construction of Community based Water Supply Project at Tsabe, Musawa LGA, Katsina State
Lot C101: Provision of Hand Pumps at Gurgu, Raddawa, K/Arewa, Y/Anguwa/ Gidan Ima and U/Rumawa, Katsina State
Lot C102: Construction of Motorised Boreholes in Safana/Dan-Musa/Batsari Federal Constituency, Katsina State
Lot C103: Construction of Community based Water Supply Project at Felende, Kebbi State
Lot C104: Provision of Hand Pumps at Galadima I& II Kukadu, Merah, Dundaye, S/GariGulma, Illela Kwaido and Kara Mosque, Kebbi State
Lot C105: Constriction of Motorised Borehole in TasharJiba, KebbiState
LotC106: Provision of Hand Pumps at Kamba, Kangiwa, Fana, Yaldu, Kare, Laima, Kyangakwai, Dole Kaina and Kwabkwaba, Kebbi State
Lot C107: Construction of Community based Water Supply Projectat Nassarawa Town, Maiyama LGA, Kebbi State
Lot C108: Provision of Hand pumps at S/Gari Koko, Zaria Kala-Kala, Kuru-Kudu village and Buma, Kebbi State
Lot C109: Provision of Hand Pumps at Bo, Rumu, Tadurga, Mangorori, Fada, Bajida, Marafa, TudunKuka, D/Kolo, Maganda, Makuku, SarkinDiri, Wsgmrf, Bena, Kanya, Waje, Danko and Kyabo, Kebbi State
Lot C110: Construction of Motorised Borehole in Bagudo/Suru Federal Constituency, Kebbi State
Lot C111: Construction of Motorised Borehole in BirniKebbi/Kal/Bunza Federal Constituency, Kebbi State
LotC112: Construction of Motorised Boreholes in Aleiro/Jega/Gwandu Federal Constituency, Kebbi State
Lot C113: Construction of Motorised Boreholes in Bakura/Maradun Federal Constituency, Zamfara State
Lot C114: Construction of Motorised Boreholes in Binji/Silame Federal Constituency, Sokoto State
Lot C115: Construction of Motorised Boreholes in Gada/Goronyo Federal Constituency, Sokoto State
Lot C116: Construction of Motorised Boreholes in Kaita/Jibiya Federal Constituency, Katsina State
Lot C117: Construction of Motorised Boreholes in Funtua/Dandume Federal Constituency, Katsina State
Lot C118: Construction of Kusada Irrigation Project (60ha), Katsina State
Lot C119: Construction of Dutsi Irrigation Project( 100ha), Katsina State
Lot C120: Construction of Small Scale Irrigation Project, Katsina State
Lot C121: Construction of Filin Gwamna Small Scale Irrigation Scheme, Kebbi State Lot C122: Construction of Water Supply Scheme at Barikin-Gari
Lot C123: Provision of Boreholes at Dakin-Gari LGA, Kebbi State
Lot C124: Rehabilitation of Kankiya Dam, Katsina State
Lot C125: Construction of Kwajali Dam, Zango LGA, Katsina State
Lot C126: Provision of Boreholes at Shinkafi and Zurmi LGAs, Zamfara State
Lot C127: Construction of Pandabuwa lrrigation Project, Matazu LGA, Katsina state Lot C128: Construction of Torankawa – Yabo Borehole Scheme, Sokoto State LotC129: Construction of Jibia Dam, KatsinaState
Lot C130: Construction of Erosion Control Projectat Madacci and Bakaya, Tambuwal LGA, Sokoto State
LotC131: Construction of Borehole at Zamangira, Bungudu LGA, Zamfara State LotC132: Construction of Borehole at Jakasa Area Zuru LGA, Kebbi State
LotC133: Operation and Maintenance of Jibiya Irrigation Project, Katsina State LotC134: Operation and Maintenance of Goronyo Irrigation Project, Sokoto State LotC135: Operation and Maintenance of Zauro Polder Project, Kebbi State
LotC136: Operation and Maintenance of Niger Valley Irrigation Project, Kebbi State Lot C137: Provision of Hand pumps in each of the 11 LGAs Fed. Constituency of
Sokoto State
Lot C138: Provision of Hand pumps in each of the 7 LGAs Fed. Constituency of Zamfara State
Lot C139: Provision of Hand pumps in each of the 15LGAs Fed. Constituency of Katsina State
Lot C140: Provision of Hand pumps in each of the 8LGAs Fed. Constituency of Kebbi State
Lot C141: Operation and Maintenance of Zobe Irrigation Project, Katsina State
LotC142: Provision of Hand pumps in Bakori/Danja LGAs, Katsina State
Lot C143: Provision of Hand pumps in Anka/TalataMafara LGAs, Zamfara State
Lot C144: Provision of Hand pumps in Yabo/Shagari LGAs, Sokoto State
Lot C145: Provision of Hand pumps in Bagudo/Suru LGAs, Kebbi State
Lot C146: Provision of Hand pumps in Funtua/’Dandume LGAs, Katsina State
Lot C147: Operation and Maintenance of Bakolori Irrigation Project, Zamfara State
Lot C148: Construction of Minor irrigation Schemes in Oroba Dakingari, Bayawa Birnin Tudu Tungan Yawo and Aliero/Danwarei, Kebbi State
Lot C149: Construction of Yauri/Ngaski Small Earth Dam and Irrigation Project, Kebbi State
Lot C150: Construction of Natu Small Irrigation Scheme, Zamfara State
Lot C151: Construction of Bukuyyum Small Irrigation Scheme, Zamfara State
Lot C152: Construction of Bakura Small Irrigation Scheme, Zamfara State
Lot C153: Construction of Borehole at KuffiYallayau, Yarranda, Kauyen Sunu, birchi, Wurma and Rawayau, Dutsi Ma LGA, Katsina State
Lot C154: Construction of Talata Mafara Water Treatment Plant, Zamfara State
Lot C155: Construction of Batagarawa Dam/Irrigation Project, Katsina State
Eligibility Criteria
For Consultancy Services
- Detailed company profile
- Submission of three (3) years Audited Accounts (2009-2011)
- Evidence of registration with CAC by inclusion of certificate of incorporation and Article of Association,
- Last 3 years Tax Clearance Certificate
- Evidence of financial capability/reference letter from reputable bank
- For JVs include MOU and each Company must have a separate registration with CAC
- Full accounts details including SORT code
- Evidence of Pension and Social Security Contribution
- Possession of satisfactory Quality Assurance/Quality Control Manual
- VAT Registration with evidence of remittances
- Evidence of experience in the last five jobs of similar nature and complexity executed within the last five years with verifiable letters of a contract award and certificate of job completion
- Evidence of registration with professional bodies such as COREN etc.
2.2 For Goods
- Evidence of experience in at least (5) jobs of similar nature and complexity executed within the last five years with verifiable letters of contract award and certificates of job completion
- Detailed company profile
- Submission of three (3) years Audited Accounts(2009-2011).
- Evidence of registration with CAC by inclusion of certificate of incorporation and Article of Association,
- Last years Tax Clearance Certificate
- Evidence of financial capability/ reference letter from reputable bank.
- For JVs include MOU and each Company must have a separate registration with CAC
- Full accounts details including SORT code
- Evidence of Pension and Social Security Contribution
- Possession of satisfactory Quality Assurance/Quality Control Manual
- VAT Registration with evidence of remittances
For Works
- Evidence of experience as main Contractor in at least (5) jobs of similar nature and complexity executed with verifiable letters of contract award and certificate of job completion within the-last five years) to comply with this requirement, works quoted should be at least 70% physically completed). Evidence of two(2)number completed similar projects in the last three years
- Having liquidity and or evidence of access to or availability of confirmed credit facilities of not less than 50,000,000.00 Naira from a reputable bank
- Detailed company profile
- Submission of three (3)years Audited Accounts(2009 -2011).
- Evidence of registration with CAC by inclusion of certificate of incoperation and Article of Association,
- Last 3years Tax Clearance Certificate
- Evidence of financial capability/ reference letter from reputable bank.
- For JVs include MOU and each Company must have a separate registration with CAC Full accounts details including SORT code
- Evidence of Pension and Social Security Contribution
- VAT Registration with evidence of remittances
- Evidence of construction equipment capability and their status where applicable
- List of personnel: their qualifications (CV) and experience in similar works.
Submission/Opening Of Documents
Technical proposals for the projects of interest should be submitted in two (2) hard copies in Microsoft Office and enclosed in separate sealed envelopes marked ‘Technical’ and both in a third envelope with the project name marked clearly on top right hand comer, and addressed to:
The Managing Director
Sokoto Rima River Basin Development Authority,
DamaleKaita House, PMB 2223,
KM10, Gusau Road, Sokoto
To reach him on or before Monday 11th June, 2012 at 12 noon
Technical bid opening exercise shall be conducted publicly in the Board Room of the Sokoto Rima River Basin Development Authority on the closing date of submission at 12.00 noon
Disclaimer
Late submission shall be rejected
This invitation is published for information purposes and does not constitute an offer by this Authority with any party for the projects, nor does it constitute a commitment or obligation on the part of this Authority to procure concession services.
This Authority will not be responsible for any costs or expenses incurred by any interested party in connection with any response to this invitation and or the preparation or submission in response to an RfP
This Authority is not bound to short list any bidder and reserve the right to annul the bidding proc at any time without incurring any liabilities and assigning any reason thereof.
This Authority reserves right to take final decision on any of the documents received proposals.
This Authority reserves right to take final decision on any of the documents received in your proposals.
Signed
Management.