Nigerian Gas Company Limited
(A Subsidiary of Nigerian National Petroleum Corporation)
Invitation for Expression of Interest For Upgrade Of Ewekoro Metering Station, Ewekoro, Ogun State
The Nigerian Gas Company Limited (NGC), a subsidiary of Nigerian National Petroleum Corporation (NNPC) intends to undertake urgent Upgrade of the Ewekoro Metering Station, Ewekoro, Ogun State.
In this regard, NGC hereby invites experienced, capable and reputable contractors to pre-qualify for the Engineering, Procurement and Construction (EPC) works. Contractors that are successful in the pre-qualification exercise may be invited to tender for the EPC.
1.0 Proposed Scope of Works
The scope of works for the upgrade of the Ewekoro Gas Metering Station Includes but not limited to the following:
i) Engineering, detailed design and procurement of a 50mmscfd Pressure Reduction and Metering Station (PRMS) with the Mowing components: Inlet section, Filtering section, Heating section, Pressure Reduction section, Metering section and Outlet section.
ii) Shipment of the entire package to Lagos Port, Nigeria.
iii) Custom’s clearing, Port duties and handling charges.
iv) Warehousing of the PRMS, if necessary
v) Transportation of the PRMS to site
vi) Site preparation and civil work
vii) Construction of a temporary bye-pass line
viii) Decommissioning of the existing system and transportation to NGC-LOD Warehouse for storage
ix) Installation, Testing and Commissioning of the new metering station facilities including boiler and heat exchanger packages, ESD valves, regulators, gas chromatographs, flow computers/panels and ups etc
x) Decommissioning of the temporary bye-pass
xi) Any other work required even if such is not state in this scope of work
xii) Site clean up and Demobilization
2.0 Specified Requirements from Interested Companies
Thos interested in the prequalification process are required to submit comprehensive
technical and financial information as follows:
2.1 Company Legal Status and Profile
Company’s name, postal address, telephone/fax number and e-mail address of Head office where correspondence is to be directed. It should incorporate Nigerian shareholding and evidence of company registration in Nigeria including Certificate of Incorporation, certified true copies of memorandum and Articles of Association and CAC form C07.
2.2 Registration Certificates
Evidence of Company incorporation, current registration with the Department of
petroleum Resources (DPR), and registration with NNPC or any of its subsidiaries.
2.3 Local Content
Has contractor formed a joint venture with Nigerian or foreign contracting firms? If
so, give details and identify principal partner(s) and provide a copy of executed
agreement.
2.4 Relevant Experience
Provide verifiable evidence of previous corporate experience and capabilities in
carrying out similar works undertaken by contractor, which are considered relevant
in demonstrating the ability and capability of the contractor to successfully
undertaken the project.
This information must include:
i) Name of project(s)
ii) brief description of project(s)
iii) Client(s)
iv) Scope of works performed by the contractor
v) Contract value
vi) Date of award of contract(s)
vii) Contractual period of execution of contract(s)
viii) Actual period of execution
ix) Reasons for discrepancies between contractual and actual contract execution period
x) Nature of contract (fixed lump sum, reimbursable etc)
xi) Name and address of a Ref