Federal Government of Nigeria
Federal Ministry of Petroleum Resources
Block D, NNPC Towers, Herbert Macaulay Way,
Central Business District, PMB 449, Abuja
Request for Expression of Interest from Competent Consultants
The Federal Ministry of Petroleum Resources hereby invites reputable and competent companies to express interest in Project Management Consultancy for the implementation of the under listed year 2010 Capital Projects;
Project Lot | Project | Tender Processing Fee N |
1 | Equipment and Services for Gas Reserves Studies | 10,000.00 |
2 | Gas Mapping Services Covering Equipment Operations and Documentation | 5,000.00 |
3 | Real Time Monitoring of gas facilities, production and operations | 10,000.00 |
4 | Instruments for Real Time Pipeline Surveillance | 10,000.00 |
5 | Implementation of Trucking Policy | 5,000.00 |
6 | Gas Royalty Reconciliation | 5,000.00 |
7 | Gas Flaredown monitoring facilities and services | 5,000.00 |
8 | Implementation of Petroleum Industry Bill (PIB) | 5,000.00 |
9 | Utorogu – Ughelli/ PHCN Delta IV Gas Supply Line | 15,000.00 |
a | Conceptual Studies (including flow assurance Studies) | |
b | Environmental Impact Assessment (EIA) | |
c | Front End Engineering Design | |
d | Contracting Services for EPC | |
e | Technical Site Surveys | |
f | Detailed Engineering Design | |
g | Procurement and Construction | |
10 | Calabar –Umuahia-Ajaokuta Gas Pipeline (Project Studies) | 15,000.00 |
a | Conceptual Studies (including flow assurance Studies) | |
b | Environmental Impact Assessment (EIA) | |
c | Front End Engineering Design | |
d | Contracting Services for EPC | |
e | Technical Site Surveys | |
f | Detailed Engineering Design | |
g | Project Administration (including Engineering Reviews) | |
11 | Ajaokuta-Abuja-Kano Gas Pipeline (Project Studies) | 15,000.00 |
a | Conceptual Studies (including flow assurance Studies) | |
b | Environmental Impact Assessment (EIA) | |
c | Front End Engineering Design | |
d | Contracting Services for EPC | |
e | Technical Site Surveys | |
f | Detailed Engineering Design | |
g | Project Administration (including Engineering Reviews) | |
12 | Ob/Ob-Owerri-Umuahia Gas Pipeline System (Engineering Studies) | 15,000.00 |
a | Conceptual Studies (including flow assurance Studies) | |
b | Environmental Impact Assessment (EIA) | |
c | Front End Engineering Design | |
d | Contracting Services for EPC | |
e | Technical Site Surveys | |
f | Detailed Engineering Design | |
g | Project Administration (including Engineering Reviews) | |
13 | Construction of National Laboratory In Owerri (Engineering Studies) | 15,000.00 |
a | Conceptual Studies | |
b | Environmental Impact Assessment (EIA) | |
c | Front End Engineering Design (including Prototype Model and Animated Walkthrough) | |
d | Contracting Services for EPC | |
e | Technical Site Surveys | |
f | Detailed Engineering Design | |
g | Project Administration (including Engineering Reviews) | |
14 | Actualizing and implementing E-Government for process and procedure in the Ministry of Petroleum Resources | |
Document Management and Store Inventory System | 5,000.00 | |
A | Facilities and Equipment for Capacity Development | |
Establishment of Oil and Gas Reference Library | ||
Library Development and Automated | ||
Establishment of Automated Accounting System (AAS) | ||
B | Lease of 3 Nos. 7-Seater Helicopter for Inspection/Monitoring offshore Terminals | |
Procurement of Laboratory Wares | 5,000.00 | |
Procurement of Crude Oil Terminal Equipment | ||
C | Partitioning/Furnishing of DPR’s Abuja Office | |
Renovation of Offices | 5,000.00 | |
Furnishing of offices | ||
D | Economic investigation, Consultancy Services Statistical Data Development and Database | 5,000.00 |
Instruments for GMP implementation to ensure indigenous 3rd party participation | ||
E | Instruments for the implementation of Domestic gas supply obligation | |
Acquisition of facilities for monitoring Domestic Gas Supply | 5,000.00 | |
Acquisition of international Codes and Standards on Oil and Gas Industry Practice | ||
F | Environmental Baseline Survey for Contiguous Nigerian Continental Shelf (to Establish Control Criteria for Environmental Quality and Easy Mapping | |
Pilot Project on Novel Oil and Gas Exploration Technology | 5,000.00 | |
G | Evaluation of Hydrocarbon In-transit Pipeline loss | |
Evaluation/Review of Domestic Gas Pricing Model | 5,000.00 | |
Establishment of Vapour Pressure for Commercial Natural Gas Liquids | ||
H | Facilities and Services for Pipeline Network (integrity and flow assurance) monitoring facilities | |
Instruments for pipeline network management and operations | 5,000.00 |
2. Submission of Proposals (Technical and Financial):
Submission of Technical and Financial proposals must be in separate sealed envelopes indicating the lot(s) of choice and submitted in the tender box at the address below on or before 25th November 2010. Bids will be immediately opened in the presence of the bidders/representatives at the Conference Room of the Ministry on the 6th floor, Block D, NNPC Towers, Central Business, District at 12 noon on the 25th November, 2010.
3. Requirements:
- Evidence of Registration with Corporate Affairs Commission (CAC)
- Company’s Audited Accounts for 2007, 2008, and 2009
- Tax Clearance Certificate for 2007, 2008, and 2009
- Evidence of VAT Registration and Remittances
- Evidence of Pensions Fund Registration and Remittances
- Evidence of financial capability and banking support
- Verifiable evidence of similar jobs executed in the past and knowledge of the industry
- Technical qualification and experience of key personnel and
- Evidence of payment of Tender Fee in (Sank Draft) in favour of Ministry of Petroleum Resources
4. For submission of proposals and enquiries, please contact:
The Secretary,
Ministerial Tenders Board
Ministry of Petroleum Resources
NNPC Towers, Block D, 8th Floor
Herbert Macaulay Way,
Central Business District,
Abuja, Nigeria
Signed
Permanent Secretary
Min. of Petroleum Resources
Abuja