Tender No. |
NJQS Category |
Scope of work Description |
TB-3067
Casing & Tubular
Running Services |
3.04.05 |
- Contractor must be able to provide Casing & Tubular Running Equipment and Services including but not limited to the following:
- Casing & Tubular running equipment for OD sizes of 36”, 30”, 20”, 13-3/8”, 11-3/4, 9-5/8”, 7-5/8”, 7”,4-1/2”, 3-1/2, 2-7/8” and 2-3/8”;
- Tubular running services
- Bucking services and pressure testing of bucked sub-assemblies
- All necessary Consumables and spare parts; and
- All other related equipment tools and experienced personnel necessary to satisfactory perform the above services
|
TB-3085
Fishing Services |
3.04.12 |
- Contractor must be able to provide Fishing Tools and Services including but not limited to the following
- Single trip whipstock system for casing sizes 7″, 75/8″, 9 5/8″, 13 3/8″and 20″of light and heavy wall thickness;
- Various types and sizes of mills (starting, window, watermelon, string, section, junk and tapered mills) dressed with tungsten carbide particles;
- Fishing tools for various drilling tool operations (fishing jars, accelerators, intensifiers, bumper subs, overshots overshots extension, reverse circulating junk baskets, control/packet grapple, string and ditch magnets, taps, washover pipes, abandonment tools etc, for drilling logging and testing operations;
- All necessary consumables and spare parts; and
- All other related equipment, tools and experienced personnel necessary to satisfactory perform the above services
|
TB-3086
Drilling Tools
Rental Services |
3.04.99
&
1.0L13 |
- Contractor must be able to provide Drilling Tools/Equipment Rentals Services including but not limited to the following:
- Drilling tools (various sizes of drilling jars, subs, hole openers, under-reamers, accelerators, drill collar, heavy weight drill pipes, drill pipes, pup joints cross-over, bit subs, non-magnetic drill collar etc);
- BOP related equipment 5K, 10K and 15K rated (various sizes of flanges, double studded adaptor, riser spools, BOP flanges, BOP rams & other accessories, IBOP valves, Kelly valves, side entry subs, safety damps, stabbing guide, mud basket etc);
- All necessary Consumables and spare parts; and
- All other related equipment, tools and experienced personnel necessary to satisfactorily perform the above services
|
TB-3081
Drilling Completion Fluids & Mud Engineering Services |
3.04.15 |
- Contractor must be able to provide Drilling/Completion Fluids/Chemicals and Engineering Services including but not limited to the following
- Mud design, formulation and engineering:
- Materials/chemicals and engineering for water based and synthetic based drilling fluids
- Materials/chemicals and engineering services for reservoir drill-in fluids,
- Materials/chemicals and engineering services for well completion fluids;
- Base oil;
- Liquid and bulk .storage facilities;
- All drilling/completion fluids and chemicals must be approved my DPR.
- All necessary consumables and spare parts; and
- All other related equipment, tools and experienced personnel to satisfactory perform the above services.
|
TB-3066
Surface Testing Services |
3.04.16 |
- Contractor must be able to provide Surface Testing Equipment & Services including but not limited to the following;
- Surface testing equipment and personnel required to handle flowback of well effluent during Well Testing and cleanup operations. The SOW covers the equipment needed from the rotary table through to the burner booms. The equipment proposal must be able to fulfill the following requirements
- Safe flow, containment and control of well effluent during all phases of the operation
- Safe disposal of well effluent according to regulatory environmental requirements
- Measurement and sampling of well effluent during flow-back operations
- Measurement and recording of all flow parameters
- All other related equipment, tools and experienced personnel necessary to satisfactorily perform the above services.
|
TB-3065
Cement and Cementing Services |
3.04.04 |
- Contractor must be able to provide Cement & Cementing Services including but not limited to the following:
- Onshore truck-mounted diesel driven cement unit, equipped with muffler and spark arrestors, 10,000 psi rated with twin pumps c/w dual stage 8bbi/ min re-circulating Mixer, automatic density control system and digital data acquisition package for pump rate, pressure, fluid density, cumulative volume, fluid density e.t.c
- Cement design, formulation, laboratory testing and engineering:
- Cement, cement chemicals and additives; onshore bulk plant for cement delivery
- Cementing equipment accessories such as float collar, float shoe, stage collars, centralizers, stop collars wiper plugs, subsea release plug systems and associated surface cementing head.
- Squeeze packer, testing/ treatment packers, bridge plugs, cement retainers, storm packers/ valves etc;
- Pumping and pressure testing services, including low pressure gauge manifold;
- All necessary consumable and spare parts; and
- All other related equipment tools and experienced personnel necessary to satisfactorily perform the above services
|
TB-3083
MWD/LWD/DD Services |
3.04.08
&
3.04.31 |
- Contractor shall have the necessary experience capability and shall be fully responsible for the provision of MWD/LWD/DD tools and services including but not limited to the following
- Directional Drilling Services and Measurement While Drilling Tools (rotary steerable tools-push and point the bit technology, adjustable mud motors geosteering tools, etc in various sizes;
- Logging While Drilling Tools (formation and annular pressure while drilling tools, minimum 8 curves multi-depth and multi-frequencies resistivity, azimuthal resistivity, neutron, azimuthal density, sonic, density caliper, ultra sonic azimuthal caliper, etc in various sizes);
- Note: All nuclear sources should be retrievable type or a non-hazardous non-retrievable type,
- Geosteering Services;
- Real-Time Drilling operations Monitoring and transmission services including satellite internet connectivity provisions;
- Tools and all required accessories to support 3rd party Gyro While Drilling (GWD) services;
- Geomechanical modeling services
- Well planning services;
- All necessary consumables and spare parts; and
- All other related equipment, tools and experienced personnel necessary to satisfactorily perform the above services.
|
TB-3078
Mud Logging Services
|
3.04.07
|
Contractor shall have the necessary experience, capability and shall be fully responsible for the provision of, including but not limited to, the following;
- Mud logging unit;
- Basic mud logging equipment/tools;
- Advanced mud logging equipment/tools;
- Tools to prediction-nation pore pressure during drilling operation using data from all available rig resources.
- Early Kick detection tools / appliances / softwares capabilities
- Tools/sensor capabilities for High pressure and high temperature environment
- Visual warning light and audible alarm to indicate well flow (drilling, tripping and connections) or other suitable alarm indicator system in driller’s dog house.
- Monitor screen in Company Man’s office on the rig.
- Tools to monitor connection flow back and analysis to differentiate between well ballooning or/and well flow when pumps are turned off.
- Differential flow monitoring to identify both well outflow and losses to the wellbore.
- Formation logging;
- All necessary Consumables and spare parts; and
- All other ablated equipment, tools and experienced personnel necessary to satisfactorily perform the above services
|
TB-3070
Solid Control Services
|
3.04.15
|
Contractor must be able to provide Solids Control Equipment & Services including but not limited to the following:
- Solids Control equipment (high and variable speed centrifuge, cuttings Drier/mud recovery system, complete auger system and mono pumps diaphragm pump, mud vac, high pressure steam cleaner etc);
- All necessary Consumables and spare parts; and
- All other related equipment, tools and experienced personnel necessary to satisfactorily perform the above services
|
TB-3082
Wireless Services |
3.04.24
|
Contractors must be able to provide Wire-line Logging Equipment and Services including but not limited to the following:
- Wire-line logging unit and tools including VSC, Oil Based Mud Borehole Imager, resistivity, neutron density; sonic, Formation pressure. Down hole Fluid Identification and Sampling, etc;
- Open and Cased hole Wire-line Logging services;
- Associated Data processing servives
- Real-Time Logging Operations Monitoring and transmission services including satellite internet connectivity
- All necessary Consumable and spare parts; and
- All other related equipment, tools and experienced necessary to satisfactorily perform the above services
|
TB-3087
Slick line Services |
3.04.24 |
Contractor must be able to provide Slick-line Tools/Equipment & Services including but not limited to the following;
- Slick-line tools/equipment (double drum slick-line unit c/w power pack, hydraulic BOP’s & pressure control equipment, rope socket pulling/running tools, gauge cutters, blind boxes etc).
- All necessary Consumable and spare parts; and
- All other related equipment, tools and experienced personnel necessary to satisfactorily perform the above services.
|
TB-3080
Down hole
Testing Services |
3.04.30
|
Contractor must be able to provide Down hole
Testing Equipment & Services including but not limited to the following;
- Drill Stem Test (DST) (various size of retrievable and permanent down-hole testing packers, locators and seal assembles, safely valve, testing and circulating valve, guage carriers, bottom hole sampler carrier, rupture disk and tubing fill valves, surface test tree manual valves, hydraulic actuator, swivel, check valve, emergency shutdown system, high accuracy and high resolution gauges, surface readout equipment etc).
- Tubing Conveyed Perforation (TCP) (various sizes/charges/shot per foot tubing conveyed perforation RDX & HMX guns, gun spacer, automatic gun drop sub, mechanic firing head, mechanic and automatic tubing release, automatic time-delay firing head, pressure vent etc.)
- All necessary Consumables and spare parts; and
- All other related equipment, tools and experienced personnel necessary to satisfactorily perform the above services
|
TB-3075
Coil Tubing and Nitrogen Services
|
3.04.37
|
Contractor must be able to provide Coil Tubing Unit, Equipment & Nitrogen Services including but not limited to the following;
- Truck mounted coiled tubing unit – coil tubing control cabin with impact resistant windows and contains all necessary controls, communication and calibrated monitoring facilities to ensure a safe and efficient operation;
- Coil Tubing Lift Frame as per API 8C with power supply and accessories.
- Crossovers to Pressure Control Equipment and tubulars.
- Long Bails.
- Coiled tubing reel capable of operating with pipe diameters between 11/4’’ and 23/8” (inclusive) with a drum capacity of up to 15, 000ft x 10, 000 psi;
- Coiled tubing injector head, Stuffing Box/ Dual Stripper, Dual Shear Seal BOP;
- Power Pack for power supply;
- Coiled tubing tools such as; Straight bar, Connector, Emergency disconnect, Check valves, Jetting nozzles, Fishing equipment and Connectors for well intervention tools jars, motors, impact hammers, accelerators.
- Data acquisition unit;
- Pumping unit;
- Nitrogen and Nitrogen quads;
- How back storage tanks;
- Toolbox with fishing tools and equipment for all coil tubing tools specified.
- Nitrogen converter capable of: delivering nitrogen at 350sct/min at a pump output pressure of 3000psi etc); and will include; Inlet and exhaust flame traps, over-speed shutdown, High exhaust or water temperature shutdown, Anti-static equipment and Inertia or air starter motors.
- All necessary Consumables and spare parts; and
- All other related equipment, tools and experienced personnel necessary to satisfactorily perform the above services
|
TB-3072
Gyro Services |
3.04.29 |
Contractor must be able to provide Gyro Tools/Equipment and Services including but not limited to the following;
- Battery operated memory single-shot / multi-shots North Seeking Gyro services deployable by Drop, wire-line or slick-line
- Single-shot / multi-shots surface readout North Seeking Gyro
- Multi-axis Gyro sensor multi-shots continuous North Seeking Gyro
- North Seeking Gyroscopic probe operational in MWD collar of various major directional drilling contractors
- GR/CCL subs to run in some applications with North Seeking Gyro tools
- Mono cable or multi-conductor wire-line unit and accessories
- Gyro While Drilling (GWD) Tools;
- Wire-line pressure control equipment
- All necessary consumables and spare parts; and
- All other related equipment, tools and experienced personnel necessary to satisfactorily perform the above services.
|
TB-3069 Surface Well-head Equipment & X-mas Trees Supply/Services |
1.01.09 |
Contractor must be able to provide Surface Wellhead Equipment & X-mas Trees Services including but not limited to the following;
- Complete Single Bore Compact wellhead system with profiles for 9-5/8” 47 ppf and 7”29 ppf casing strings
- Complete Single Bore Compact wellhead system with profiles for 13-3/8” 68 ppf and 9-5/8” 47 ppf casing strings
- Complete Dual Bore Compact wellhead system with profiles 36”, 13-3/8” 68 ppt and 9-5/8” 47 ppf casing strings.
- Complete Stack up wellhead system with profiles for 9-5/8“47 ppf and 7″29 ppf casing strings.
- Complete Stack-up wellhead system with profiles for 13-3/8“68 ppf and 9-5/8 47 ppf casing strings.
- Complete Stack-up wellhead system with profiles for 20″94ppf, 13-3/8“68 ppf and 9-5/8” 47 ppf casing strings.
- Block Type Single String Xmas Tree assembly with Actuator and Choke box for 7″, 5″, 4-1/2”, 3-1/2” and 2-7/8” tubing strings.
- Stack-up Type Single String Xmas Tree assembly with Actuator and Choke box for 7″, 5″, 4-1/2“, 3-1/2“and 2-7/8” tubing strings
- Block Type Dual Strings Xmas Tree assembly with Actuators and Choke boxes for 3-l/2“and 2-7/8“tubing strings.
- Stack-up Type Dual Strings Xmas Tree assembly with Actuators and Choke boxes for 3-1/2” and 2-7/8” tubing strings.
- Running tools to effectively deploy wellheads, function and pressure test same (including wear bushings to enable drilling operations through the wellheads).
- Surface wellhead should be capable to accept another contractor’s Xmas tree and other ancillary tools as may be required without any technical issue.
- All necessary Consumables and spare parts; and
- All other related equipment, tools and experienced personnel necessary to satisfactorily perform the above services.
|
TB-3068
Welding Habitat Services |
3.05.17 |
- Contractor must be able to provide Welding Habitat and Welding Services including but not limited to the following:
- Provision of Welding Habitat, suitable for welding operations in Zone 1 hazardous areas. including but not limited to welding on oil well Conductor pipes and casing strings;
- Provision of Pre-welding/Post-welding heat treatment equipment and materials;
- Provision of, welders trained to conduct welding and are-cutting/flame cutting operations and inspectors trained to conduct inspection in their respective category;
- Provision of all consumable and spare parts for equipment on a consignment basis; and
- All other related equipment, tools and experienced personnel necessary to satisfactorily perform the above services
|
B-3076
Completion
Services – Cased
Hole and Liner Hanger |
3.04.21 |
- Contractor must be able to provide Cased Hole Completion Equipment Liner Hanger & Services including but not limited to the following
- cased hole upper completion for horizontal well (3-12”9.3# EUF, 4-1/2” 12.6# Vam top tubing retrievable subsurface safety valve flapper type, c/w self-equalizing feature, permanent lock open feature, and 2.81” nipple adapter w/B profile c/w jam nut type connection for ¼” control line, tubing mounted nipples, flow couplings, gas lift mandrels, hydraulic/electric line set retrievable production packers, locators, seals units and self-indexing guide shoe etc). for various casing sizes and weights.
- Liner top packers for various casing sizes and weights.
- Tie – back seal assemblies/packers for various casing sizes and weights
- Liner hanger running tools and services
- All necessary Consumables and spare parts; and
- All other related equipment, tools and experienced personnel necessary to satisfactorily perform the above services.
|
TB-3077
Completion Services – Stand Alone and Expandable Sand Screen |
3.04.21 |
- Contractor must be able to provide Stand Alone and Expandable Sand Screen & Services including but not limited to the following
- Various sizes of standard and high premium Stand Alone Screen (SAS) w/varying gauges or mesh sizes with BTC threads.
- Various sizes of controlled delayed swell packers in synthetic oil based mud (Oil and water swellable) with BTC threads.
- Various sizes of Expandable Sand Screen (ESS) w/varying gauge or mesh sizes
- various sizes Expandable blank pipes
- Appropriate hangers and packers for various casing sizes.
- All necessary Consumables and spare parts; and
- All other related equipment, tools and experienced personnel necessary to satisfactorily perform the above services
|
TB-3071
Gravel Packing Services |
3.04.33 |
- Contractor must be able to provide Gravel Pack, Frace Pac, Single Trip Perf Pac Equipment and Services including but not limited to the following:
- Pumping Equipment (pumping unit, flowlines, valves, hoses, acid mixer, acid retum tanks, etc);
- Packing Materials (chemicals, proppant, etc);
- Downhole Tools to perform standard Gravel Packing.
- Complete Downhole Tools to perform Frac Packing in various hole sizes
- Downhole Tools including DST tools, TCP tools and Guns to perform a Single Trip perf Packing System in various hole sizes
- Selective Horizontal Open Hole Gravel Packing with Inflow Control devices on the screens.
- Various sizes of premium wire wrap sand screen in various mesh sizes and design profiles suitable for each of the packing methods listed above
- Filtration of packing fluid;
- All necessary Consumables and spare parts; and
- All other related equipment, tool and experienced personnel necessary to satisfactorily perform the above services.
|
TB-3092
Coring Services |
3.04.11 |
- Contractor must be able to provide Core Acquisition Equipment and Preservation Services including but not limited to the following
- Coring Equipment & Tools (12 ¼”,8 ½” and 6” coring system/tools for consolidated and unconsolidated formation);
- Coring services (consolidated and unconsolidated formations);
- Core preservation services;
- All necessary Consumables and spare parts; and
- All other related equipment, tool and experienced personnel necessary to satisfactorily perform the above services.
|
|
|
|
|
|