Second National Urban Water Sector Reform Project
Or, 4086-UNI (Project ID No, P071301)
Consulting Service for Engineering Supervision of Rehabilitation of Raw Water Intake-Cum-Pumping Stations at Akute
Request for Expression of Interest (EOI)
This invitation for proposals follows the general procurement notice for this project that appeared in Development Business No.673 of February 28, 2006 on-line and DG Market
The Lagos State Government of Nigeria has received financing from the International Development Association through the Federal Government of Nigeria toward the cost of the Second National Urban Water Sector Reform Project and intends to apply part of the proceeds for Consultancy Services for Engineering Supervision of Rehabilitation of Raw Water intakecum-Pumping Stations at Akute.
The service is for engineering supervision of rehabilitation of the raw water intake-cum-pumping station. It is estimated that a maximum of 12- 15 months of consulting services inputs will be required for the following:
S/No | Equipment Description | Quantity |
General | ||
1 | 3.8MVA Deutz Generators | 2Nos |
2 | 1,500KVA Mirrless Blackstone Generators | 4Nos |
Pumpsets | ||
3 | 1400KW, 11KV Siemens Electric Motors | 6Nos |
4 | 4,535m2/h Guinnard Pumps | 6Nos |
5 | 565KW, 3.3KV Teco Electric Motor | 5Nos |
6 | 2,200m2/h Weir Pumps | 5Nos |
7 | 305KW, 3.3KV Teco Electric Motor | 4Nos |
8 | 1,100m2/h Weir Pumps | 4Nos |
9 | 33KV, 1,250Amps Merlin Gerin Electrical Control Panels | 4 Cubicles |
10 | 11KV Switchgear Panels | 37 Cubicles |
11 | 33KV, Resistance Starter Panels | 6 Cubicles |
12 | 33KV, Feeder Panels | 13 Cubicles |
13 | 415V MCC Panels | 8Nos |