Solicitation for Pre-Qualification of Contractors at Niger Delta Development Commission (NDDC)

The Presidency

Niger Delta Development Commission

NDDC

167, Aba Road, Port Harcourt, Rivers State www.nddc.gov.ng

 

 

Solicitation for Pre-Qualification of Contractors

 

Introduction

The Niger Delta Development Commission (NDDC) in furtherance of its mandate is planning to undertake a developmental project for the even, rapid and sustainable development of the Niger Delta Region and is seeking to hire specialist contractor for the execution of the under listed project. The NDDC, therefore request for the solicitation for prequalification from top flight, knowledgeable, competent and experienced contractors whose areas of competence and core business fall within the project classification.

 

The projects are:

 

S/N

 

PROJECT DESCRIPTION STATE
1

 

Construction of Afara Ukvvu Radial Road/Bride in Umuahia.

(32km + 45m Span) Bridge.

Abia

 

2

 

Construction of 15km Isuochi – Nneato Road

 

Abia

 

3

 

Construction of Idung Atangedem-lne Akpautoug to Atlantic Ocean

 

Akwa Ibom

 

4

 

Construction of Asaba – Ase / Abari Road

 

Delta

 

5

 

Canalization of Siloko – iguniwei-f aribor Creek

 

Ondo

 

6 Obstruction of Ndoni – Aboh Road and Bridgt (1.65km Bridge aross River Niger) Linking Delta & Baydsa

 

 

Rivers

 

 

Solicitation for Pre-Qualification

Every interested and suitably qualified contractor with real operating and relevant experience is invited to submit its solicitation for pre-qualification document to be used for pre-qualification exercise.

 

A.      CORPORATE

  • Evidence of registration with CAC
  • Clear indication of a verifiable head office address
  • Corporate profile of the company indicating ownership structure
  • A confirmable evidence of up-to-date Annual Returns;
  • A confirmable VAT certificate with evidence of remittance;
  • A confirmable evidence of Tax Clearance Certificate for the past 3 years duly certified by FIRS
  • Proof of contribution to ITF
  • Sworn affidavit that the company is not bankcrupt
  • Sworn Affidavit that the contractor/key personnel are not ex-convicts or bankrupt
  • Evidence of financial capability and banking support including banks reference and recent statement of account
  • A statement of interest including a statement of availability to undertake the job (within agreed time frame)
  • An undertaking/ Assurance for the delivery of the project in line with project brief.

 

B.      Technical

1.       Area(s) of specialty

2.      Technical   capability   of   the   company/including CV/photocopies of certificates of relevant staff

3.      Evidence of track records in the execution of similar projects

4.      Evidence of payment for similar job done in the past with verifiable names and telephone numbers of contact persons from the awarding institutions

5.      CASHES and quality Assurance policy of the company.

6.      Any other relevant information that will facilitate the evaluation of the company.

 

Evaluation Criteria

Contractors are expected to comply with the above requirements as failure may lead to the cancelation of the contractor’s submission. Contractors are to submit only genuine and verifiable documents as contractors who submits fake or fraudulently obtained documents will be disqualified and the attention of relevant security agencies may be drawn. All solicitation for prequalification will be based on the contractor’s technical and corporate capabilities.

 

 

Other Relevant Information

The selection of contractors for this project will follow

  • the provision and procedures outlined in the Public Procurement Act 2007. Only Contractors who have been successfully pre- qualified   will   proceed   to   the   next   stage   of  the procurement  process  and  would   be  duly  notified through a publication on the NDDC official website Contractors  can  seek clarifications  or request for additional information by writing to the office listed below before the deadline of the submission, from 11 am to 4pm Mondays through Fridays (except public holidays)
  • Contractors are advised not to try to influence the selection process as this will lead to their immediate disqualification. Such contractors may also be barred from seeking other job opportunities from the Commission. All cost incurred by any Contractor in the preparation and submission of the document are to be borne entirely by the Contractor.
  • The Commission reserves the right to reject any/all of the documents and to terminate the entire selection process at any time without any liability to the Commission.

 

Validity of the Solicitation for Prequalification

Solicitation for pre-qualification written in English language must be submitted in an addressed envelope marked at the top left corner “SOLICITATION FOR PRE­QUALIFICATION” to the address stated below on or before Friday, February 28th 2013

 

THE MANAGING DIRECTOR/CEO

Niger Delta Development Commission

167, Aba Road, Port Harcourt

Rivers State

 

Signed:

Management

Subscribe / Share

tendersnigeria tagged this post with: , , Read 4546 articles by

Leave a Reply

Your email address will not be published. Required fields are marked *

Search for Tenders

Subscribe to Email Alerts